Steam generation boiler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8967088
APP PUB NO 20120312254A1
SERIAL NO

13514639

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam generation boiler having a reaction chamber formed by a bottom portion in a lower portion, a roof portion at an upper portion, and walls extending vertically between the bottom portion and the roof portion. The walls include vertical end walls having a tapering wall section that tapers symmetrically with respect to its middle axis towards the bottom portion, in which (i) a first group of steam pipes in the tapering wall section including steam pipes on both sides of the middle axis, pass at an angle with respect to the middle axis in a wall plane of the tapering wall section, and from the wall plane into the reaction chamber, and (ii) a second group of steam pipes arranged to pass to the bottom portion along the wall plane.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FOSTER WHEELER ENERGIA OYKARHULA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lankinen, Pentti Varkaus, FI 19 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00