System, apparatus and process for extraction of bitumen from oil sands

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8968579
APP PUB NO 20130098805A1
SERIAL NO

13554579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A separation process and system for extracting hydrocarbons from a mixture. In some embodiments, a process for separating a bitumen froth stream containing bitumen froth, water and fine solids into a bitumen enriched froth stream and a water and fine solids stream, comprises: (a) receiving the bitumen froth stream in a concentrator vessel, (b) distributing the bitumen froth stream in the concentrator vessel as a substantially uniform and generally horizontal flow of the bitumen froth stream at a first flow velocity, (c) slowing the bitumen froth stream to a second flow velocity, slower than the first flow velocity, in a separation region of the concentrator vessel to promote separation of the bitumen froth from the water and fine solids, and then (d) collecting a bitumen enriched froth stream and (e) collecting a separate water and fine solids stream. Related embodiments of systems and apparatus may also be provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNCOR ENERGY INC112-4TH AVENUE S W P O BOX 38 CALGARY AB T2P 2V5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bjornson, Bradford E Lethbridge, CA 10 107
Diep, John Khai-Quang Burnaby, CA 8 59
Garner, William Nicholas Fort McMurray, CA 18 317
Hann, Thomas Charles Onoway, CA 11 98
Kiel, Darwin Edward New Westminster, CA 18 179
Strand, Craig Aaron Fort McMurray, CA 4 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00