Concentrated solar thermoelectric power system and numerical design model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8975505
SERIAL NO

12924484

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention, the Concentrated Solar Thermoelectric Power System, herein abbreviated as C-STEPS, is a thermo-optical system configuration for the purpose of achieving a high solar energy-to-electricity conversion efficiency based on thermoelectric (TE) devices that use the Seebeck effect. It does so by implementing a system for concentrated solar energy using a design that combines a dual-function reflector/radiator component with an active or passive heat convection mechanism to ensure that TE module operation is maintained in a safe elevated temperature range with respect to the ambient temperature. Unsafe module temperatures are avoided by automatically adjusting the TE module hot side temperature directly or indirectly by regulating the TE cold side temperature using a variety of passive or active mechanisms, including the reflector/radiator component, phase change material, or convection/conduction mechanisms. A Numerical Design Model is used to optimize the configuration geometry and performance in various terrestrial and space applications and it is a central feature of the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LADNER DANIEL RAYBOULDER CO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ladner, Daniel Ray Boulder, US 2 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 10, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00