Toothed belt and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8979690
APP PUB NO 20130072335A1
SERIAL NO

13699943

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toothed belt has therein a core wire (3) including a core thread (1) made of aramid fiber and a filament thread (2) made of nylon fiber, and has belt tooth portions (4) and belt groove portions (5) alternately formed therealong. The core wire (3), the belt tooth portions (4), and the belt groove portions (5) are integrated with one another by a rubber material (7). It should be noted herein that the core thread (1) and the filament thread (2) are integrally twined around each other so that the filament thread (2) is formed in the shape of a plurality of loops around the core thread (1). The filament thread (2) in the shape of the loops enters tooth root portions (9) of the belt tooth portions (4) to be arranged therein. As a result, the tooth root portions (9) are strengthened.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
KURASHIKI BOSEKI KABUSHIKI KAISHA7-1 HONMACHI KURASHIKI-SHI OKAYAMA 7100054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kasuya, Akira Neyagawa, JP 17 194
Kitagawa, Tatsuya Toyota, JP 7 13
Kusu, Kazuya Osaka, JP 4 22
Miyagai, Kiyotaka Neyagawa, JP 2 2
Nagase, Takashi Nissin, JP 37 321
Yomoda, Hidetoshi Okazaki, JP 6 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00