Method for the production of alcohol from a pretreated lignocellulosic feedstock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8980599
APP PUB NO 20090035826A1
SERIAL NO

12181358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the production of glucose from a pretreated lignocellulosic feedstock is provided. The method comprises enzymatically hydrolyzing the pretreated lignocellulosic feedstock with cellulase enzymes to produce a hydrolyzate slurry comprising glucose and unhydrolyzed cellulose and fermenting the hydrolyzate slurry in a fermentation reaction to produce a fermentation broth comprising alcohol. A process stream is obtained comprising unhydrolyzed cellulose, which is then subjected to a denaturing step, preferably comprising exposing the unhydrolyzed cellulose to elevated temperatures, thereby producing a heat-treated stream comprising the unhydrolyzed cellulose. The heat-treated stream comprising unhydrolyzed cellulose is then further hydrolyzed with cellulase enzymes to hydrolyze the cellulose to glucose.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IOGEN ENERGY CORPORATION310 HUNT CLUB ROAD EAST OTTAWA ONTARIO K1V 1C1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foody, Brian Ontario, CA 79 1358
Rowland, Stephen Quebec, CA 10 120
Tolan, Jeffrey S Ontario, CA 46 1077

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00