Chemically-modified mixed fuels, methods of production and uses thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8980802
APP PUB NO 20130326951A1
SERIAL NO

13971999

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chemically-modified mixed fuel includes methane gas from at least two methane-production sources and can be utilized in any process that incorporates a Kellogg Primary Reformer. A method for producing the chemically-modified mixed fuel described herein includes providing a first methane-containing gas from a first methane-production source, providing a second methane-containing gas from a second methane-production source and blending the first methane-containing gas with the second methane-containing gas at a suitable pressure to form a chemically-modified mixed fuel. In some cases, at least one additional methane-containing gas can be provided from at least one additional methane-production source and blended with the chemically-modified fuel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANSIX RESINS & CHEMICALS LLC300 KIMBALL DRIVE SUITE 101 PARSIPPANY NJ 07054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Euen, Craig T Chester, US 4 1
Kendrick, Richard H Chesterfield, US 3 1
Loya, Mohammed I Richmond, US 3 1
Togna, Keith A Chester, US 3 1
Warren, Matthew C Richmond, US 3 1
Weeks, Steven W Chesterfield, US 4 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00