Chopper attachment to improve conditioning of bio-mass type crops

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8984851
APP PUB NO 20140260169A1
SERIAL NO

14354965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A harvesting header includes a cutter bed having a plurality of cutting elements arranged transverse to the header and a crop chopping and conditioning region having a crop chopping device and a crop conditioning device. The crop chopping device is configured to chop crop cut by the cutter bed into smaller lengths and the crop conditioning device is configured to crimp the crop to aid in drying. The first chopping roller has a tubular, cylindrically-shaped body and a plurality of parallel knife-mounting lugs extending radially outward along substantially the full length of the body. A plurality of chopping knives are attached to the knife-mounting lugs and arranged around the body, each chopping knife having a length that is shorter than the length of the knife-mounting lug to which it is attached such that each chopping knife covers only a portion of the lateral length of the first chopping roller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AGCO CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Olander, Brian Buhler, US 17 22
Pruitt, Martin Hesston, US 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00