System and method for rapid transitioning of polyolefin processes from one product to another

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8986618
SERIAL NO

13930072

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas-phase polyolefin reactor system for rapidly transitioning from one polyolefin product to another is disclosed. The reactor system comprises a steady-state control valve, a high-flow valve, a polyolefin reactor, a flow meter, a totalizer, an online analyzer and an empirical model. During a transition, the on-line analyzer measures an initial concentration of a reaction component, the empirical model predicts a required amount based upon the measured initial concentration and a selected ending concentration, the flow meter measures a flow rate, the totalizer determines a totalized amount when the flow rate of the first stream reaches the required amount based upon the measured flow rate and outputs the totalized amount to the empirical model, and the empirical model compares the required amount to the totalized amount and determines a transition endpoint. A method of rapidly transitioning the reactor system from one polyolefin product to another is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INEOS USA LLC3030 WARRENVILLE RD S/650 LISLE IL USA 60532

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chan, Ernest Alvin, US 3 6
Dudish, Gregory Menlo Park, US 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00