Fuel feed device for aviation engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8991148
SERIAL NO

13087745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A jet pump (14) is inserted between the low-pressure pump and a high-pressure fuel pump (16). A fuel metering unit (20) includes a metering valve (22) which delivers a regulated fuel flow to a feed line (30), and a bypass valve (24) which diverts to a primary intake (14a) of the jet pump the excess fuel flow supplied by the high-pressure pump. An overspeed protection unit (50) includes a control element (54) of the bypass valve (24) which causes said to fully open in the event of an overspeed of the engine. A shutoff and pressurization checkvalve (42) is mounted on the feed line and controlled by a servo-valve (44) having a high-pressure port (44a) brought to the high fuel pressure, a low-pressure port brought to the pressure of the primary intake (14a) of the jet pump and an output setting the pressure in a control chamber (42a) of the shutoff valve (42) to a value between those prevailing at the high pressure and low pressure ports. In the event of overspeed, the restriction imposed by the jet pump causes a pressure rise at the primary intake of the jet pump, hence a pressure rise in the control chamber of the shutoff valve (42), favoring the closing thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SNECMA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dore, Bastien Paris, FR 2 24
Pora, Loïc Champagne sur Seine, FR 6 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00