Upgrading deasphalting residue to high performance asphalt

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8993495
APP PUB NO 20130143778A1
SERIAL NO

13309940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A novel composition is provided that incorporates the residual solids from solvent deasphalting to make a high value asphalt product. A process for making the asphalt composition is also provided. A first portion of heavy oil or another feedstock can be deasphalted using propane deasphalting or another suitable deasphalting process. This generates a solvated fraction and an insoluble deasphalting residue. The deasphalting residue is then added to a second portion of heavy oil, such as a second portion of the same type of heavy oil that was used as feedstock in the solvent deasphalting. The mixture of deasphalting residue and heavy oil results in a novel dispersion that is suitable for use as an asphalt. Optionally, an additive such as an alkyl substituted aromatic sulfonic acid can be added to the composition to further improve the asphalt properties.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL RESEARCH AND ENGINEERING COMPANY1545 ROUTE 22 EAST P O BOX 900 ANNANDALE NJ 08801-0900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brownie, John Brights Grove, CA 2 4
Gale, Mary J Lambton Shore, CA 2 4
Moran, Lyle E Sarnia, CA 13 274
Varadaraj, Ramesh Flemington, US 130 1093

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00