Riser components and methods for making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8997877
APP PUB NO 20110240304A1
SERIAL NO

13080596

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making a riser component includes: positioning a coupler adjacent and end of a tube such that a region of the coupler forms an interface with the tube's end, wherein the region includes a material (in some embodiments an aluminum alloy), and the tube's end includes a groove and another material (in some embodiments a steel alloy) that is different than the region's material; heating the region of the coupler to increase the region's malleability; and exerting pressure on the region of the coupler to plastically deform the region to insert some of the region's material into the groove in the tube's end. By fixing the coupler to the tube in this manner, the coupler may be strongly secured to the tube, and thus able to withstand high, dynamic loads frequently experienced in service. Also, the material of the coupler may be different than the material of the tube, and thus the material of the coupler may be lighter than the material of the tube. This allows one to design a riser component that is lighter than a conventional steel riser component having a steel tube and steel flanges, but that can withstand the high, dynamic loads frequently experienced in service.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMERIFORGE CORPORATION19450 STATE HIGHWAY 249 SUITE 500 HOUSTON TX 77070

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Forrest, Scott Santa Ana, US 2 48
McTernan, Keith Huntington Beach, US 6 89
Waldron, Douglas J Fountain Valley, US 21 606

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00