Multi-plasma nitridation process for a gate dielectric

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9006064
APP PUB NO 20140252503A1
SERIAL NO

13793804

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gate dielectric can be formed by depositing a first silicon oxide material by a first atomic layer deposition process. The thickness of the first silicon oxide material is selected to correspond to at least 10 deposition cycles of the first atomic layer deposition process. The first silicon oxide material is converted into a first silicon oxynitride material by a first plasma nitridation process. A second silicon oxide material is subsequently deposited by a second atomic layer deposition process. The second silicon oxide material is converted into a second silicon oxynitride material by a second plasma nitridation process. Multiple repetitions of the atomic layer deposition process and the plasma nitridation process provides a silicon oxynitride material having a ratio of nitrogen atoms to oxygen atoms greater than 1/3, which can be advantageously employed to reduce the leakage current through a gate dielectric.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chudzik, Michael P Danbury, US 140 2519
Linder, Barry P Hastings-on-Hudson, US 58 471
Siddiqui, Shahab White Plains, US 62 1122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00