Electrically driven dump truck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9014898
APP PUB NO 20140005871A1
SERIAL NO

14004605

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle control device 50, a controller 100, an inverter control device 30 and a steering control device 32 constitute a control device 200 which controls elevation of sliders 4Ra and 4La of power collectors 4R and 4L based on information detected by a trolley wire detecting device (camera) 15. The control device 200 calculates positional relationship between a slider and a trolley wire 3R/3L based on the information detected by the trolley wire detecting device. When the slider has deviated from a prescribed range for being in contact with the trolley wire, the control device executes control to prohibit an operation for elevating the sliders or to lower the sliders when the sliders have been elevated. With this configuration, an electrically driven dump truck capable of lightening the operating load on the driver during the trolley traveling is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTD16-1 HIGASHIUENO 2-CHOME TAITO-KU TOKYO 110-0015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakajima, Kichio Isesaki, JP 34 1308
Saito, Shinjiro Kasumigaura, JP 34 648

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00