Preparation of catalyst for selective hydrogenation of hydrogenatable precursors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9018127
APP PUB NO 20130184499A1
SERIAL NO

13736229

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reduced metallic catalyst or pre-activated catalyst is formed by contacting a precursor catalyst or a reduced metallic catalyst with a modifier solution in the presence of a source of hydrogen and heat treating the precursor catalyst or the reduced metallic catalyst at super-atmospheric pressure to obtain the reduced metallic catalyst from the precursor catalyst or the pre-activated catalyst from the reduced metallic catalyst. A method of hydrogenating a hydrogenatable precursor includes providing a reduced metallic catalyst or the pre-activated catalyst prepared with modifier buffer and contacting the reduced metallic catalyst or pre-activated catalyst with the hydrogenatable precursor in the presence of hydrogen and, optionally, in the presence of a modifier solution.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LCY BIOSCIENCES INCSARNIA ONTARIO N7T 1M2

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Augustine, Robert L Livingston, US 17 200
Bhagat, Ramesh D Newark, US 1 1
Manzer, Leo E Wilmington, US 106 1718
Miryala, Balaraju Newark, US 3 3
Tanielyan, Setrak K Maplewood, US 13 138
White, James F Richland, US 83 1287

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00