Touch screen panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9019219
APP PUB NO 20130016054A1
SERIAL NO

13546519

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Touch screen panels are provided. The touch screen panel may include a first hybrid electrode including first electrode cells arranged on a substrate in a first direction and first connection electrodes connecting the first electrode cells to each other in the first direction, and a second hybrid electrode spaced apart from the first hybrid electrode on the substrate. The second hybrid electrode may include second electrode cells arranged in a second direction crossing the first direction and second connection electrodes connecting the second electrode cells to each other in the second direction. The second electrode cells are disposed between the first connection electrodes. The first hybrid electrode may include a first lower transparent layer and a first metal layer which are sequentially stacked, and the second hybrid electrode may include a second lower transparent layer and a second metal layer which are sequentially stacked.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheong, Woo-Seok Daejeon, KR 22 84
Shin, Jaeheon Daejeon, KR 13 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00