Fast startup hybrid memory module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9019792
APP PUB NO 20130148457A1
SERIAL NO

13675865

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A memory device is provided comprising: a volatile memory device, a non-volatile memory device, a memory control circuit volatile memory controller coupled to the volatile memory device and non-volatile memory device, and a backup power source. The backup power source may be arranged to temporarily power the volatile memory devices and the memory control circuit upon a loss of power from the external power source. Additionally, a switch may serve to selectively couple: (a) a host memory bus to either the volatile memory device or non-volatile memory device; and (b) the volatile memory device to the non-volatile memory device. Upon reestablishment of power by an external power source from a power loss event, the memory control circuit is configured to restore data from the non-volatile memory device to the volatile memory device prior to a host system, to which the memory device is coupled, completes boot-up.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANMINA CORPORATION2700 NORTH FIRST STREET SAN JOSE CA 95134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hinkle, Jonathan R San Jose, US 25 542
Sweere, Paul San Jose, US 16 666

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00