Low alloy steel for geothermal power generation turbine rotor, and low alloy material for geothermal power generation turbine rotor and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9034121
SERIAL NO

13448770

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A low alloy steel ingot contains from 0.15 to 0.30% of C, from 0.03 to 0.2% of Si, from 0.5 to 2.0% of Mn, from 0.1 to 1.3% of Ni, from 1.5 to 3.5% of Cr, from 0.1 to 1.0% of Mo, and more than 0.15 to 0.35% of V, and optionally Ni, with a balance being Fe and unavoidable impurities. Performing quality heat treatment including a quenching step and a tempering step to the low alloy steel ingot to obtain a material, which has a grain size number of from 3 to 7 and is free from pro-eutectoid ferrite in a metallographic structure thereof, and which has a tensile strength of from 760 to 860 MPa and a fracture appearance transition temperature of not higher than 40° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN STEEL WORKS M&E INC4 CHATSUCHO MURORAN-SHI HOKKAIDO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Azuma, Tsukasa Hokkaido, JP 37 412
Imai, Kenichi Yokohama, JP 44 514
Kajikawa, Koji Hokkaido, JP 10 37
Kaneko, Joji Tokyo, JP 3 28
Miki, Kazuhiro Hokkaido, JP 15 511
Murakami, Itaru Tokyo, JP 10 121
Ohsaki, Satoru Hokkaido, JP 14 235
Okuno, Kenichi Yokohama, JP 14 150
Suzuki, Shigeru Hokkaido, JP 294 3098
Takahashi, Makoto Yokohama, JP 401 4129
Takaku, Reki Yokohama, JP 9 27
Taniguchi, Akihiro Yokohama, JP 45 381
Watanabe, Osamu Yokohama, JP 350 4382
Yamada, Masayuki Yokohama, JP 279 3696
Yamanaka, Tetsuya Yokohama, JP 5 7
Yan, Liang Yokohama, JP 52 1082

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00