Boost converter control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9035594
APP PUB NO 20140028225A1
SERIAL NO

14112139

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A boost converter control apparatus for controlling a motor drive system which is provided with a boost converter disposed between an electric power converter and a direct current power supply, the boost converter boosting a direct current voltage of the direct current power supply and supplying it to the electric power converter, is provided with: an operating device provided with a proportional element, an integral element and a derivative element, the derivative element being configured as a bandpass filter, the operating device calculating a PID controlled variable corresponding to an electric current command value of the boost converter for maintaining an output voltage of the boost converter at a command value of an inter-terminal voltage VH of a smoothing condenser; and a controlling device which is configured to control the output voltage of the boost converter on the basis of the calculated PID controlled variable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Okamura, Masaki Toyota, JP 106 2251
Takamatsu, Naoyoshi Sunto-gun, JP 51 377

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00