Closed loop control of a cyclo-converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9036373
APP PUB NO 20130194844A1
SERIAL NO

13805427

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A three-phase resonant cyclo-converter including a closed loop control module for controlling the switching frequency of the cyclo-converter, the closed loop control module including: a voltage signal development module arranged to develop a voltage signal representative of a voltage output waveform of the cyclo-converter, a storage module arranged to accumulate voltage signal values for phase portions of the voltage output waveform, where the voltage signal values are based on a voltage error signal and accumulated historical voltage signal values for the same corresponding phase portions, and a switching frequency control module arranged to develop a switching frequency control signal to control the switching frequency of the cyclo-converter based on the accumulated voltage signal values for corresponding phase portions of the voltage output waveform, and a proportional voltage signal based on a difference between the developed voltage signal and a reference voltage signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITEDD04 Y0C2 DUBLIN 4

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Familiant, Yakov Milwaukee, US 3 5
Harrison, Michael John Christchurch, NZ 19 266
Kotula, Tomasz Christchurch, NZ 1 1
Li, Huaqiang Mendham, US 46 236

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00