FinFET-based boosting supply voltage circuit and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9036430
APP PUB NO 20150003174A1
SERIAL NO

13951585

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A memory circuit includes a voltage boosting circuit for generating a voltage that exceeds a voltage supply of the voltage boosting circuit. The voltage boosting circuit includes a first transistor having a first polarity type and a second transistor having a second polarity type opposite the first transistor. The first transistor is a planar transistor, a source of the first transistor being connected with the voltage supply, and a gate of the first transistor receiving a control signal. The second transistor includes a gate formed in at least two planes. A source of the second transistor is connected with the voltage supply, a gate of the second transistor receives the control signal, and a drain of the second transistor is connected with a drain of the first transistor and forms an output of the voltage boosting circuit for generating a boosted supply voltage as a function of the control signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joshi, Rajiv V Yorktown Heights, US 235 6113
Kim, Keunwoo Somers, US 100 707

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00