Composite micromechanical component and method of fabricating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9045333
APP PUB NO 20100308010A1
SERIAL NO

12797389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method of fabricating a composite micromechanical component, particularly for timepiece movements, including steps: a) providing a substrate including a horizontal top layer and a horizontal bottom layer made of electrically conductive, micromachinable material, and secured to each other by an electrically insulating, horizontal, intermediate layer; b) etching a pattern in the top layer through to the intermediate layer, thereby forming at least one cavity in the substrate; c) coating the top part of the substrate with an electrically insulating coating; d) directionally etching the coating and the intermediate layer to limit the presence thereof exclusively at each vertical wall; e) performing an electrodeposition by connecting the electrode to the conductive bottom layer of the substrate to form at least one metal part of the component; g) releasing the composite component from the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIVAROX-FAR S A2400 LE LOCLE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cusin, Pierre Villars-Burquin, CH 88 284
Thiebaud, Jean-Philippe Cudrefin, CH 17 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00