Method for manufacturing sputtering target and method for manufacturing semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9057126
APP PUB NO 20130133808A1
SERIAL NO

13677656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When an oxide semiconductor is deposited by a sputtering method, there is a difference in composition between a sputtering target and a film deposited using the sputtering target in some cases depending on a material of the oxide semiconductor. In manufacturing a sputtering target containing zinc oxide, a crystal which contains zinc oxide is formed in advance, the crystal is crushed, and then a predetermined amount of zinc oxide is added and mixed. After that, the resulting object is sintered to form the sputtering target. The composition of the sputtering target is adjusted by setting the proportion of zinc in the sputtering target higher than that of zinc in a film having a desired composition which is obtained at last, in consideration of the amount of zinc which is reduced at the time of deposition by a sputtering method, the amount of zinc which is reduced at the time of sintering, and the like.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEMICONDUCTOR ENERGY LABORATORY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maruyama, Tetsunori Atsugi, JP 55 1302
Yamazaki, Shunpei Setagaya, JP 7291 226813

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00