Planning economic energy dispatch in electrical grid under uncertainty
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jun 16, 2015
Issued Date -
N/A
app pub date -
Oct 1, 2012
filing date -
Jul 17, 2012
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A system and computer program product for solving a two-stage non-linear stochastic formulation for the economic dispatch problem under renewable-generation uncertainty. Certain generation decisions are made only in the first stage and fixed for the subsequent (second) stage, where the actual renewable generation is realized. The uncertainty in renewable output is captured by a finite number of scenarios. Any resulting supply-demand mis-match must then be alleviated using high marginal-cost power sources that can be tapped in short time frames. The solution implements two outer approximation algorithms to solve this nonconvex optimization problem to optimality. Under certain conditions the sequence of optimal solutions obtained under both alternatives has a limit point that is a globally-optimal solution to the original two-stage nonconvex program. A further decomposition approach derived from the Alternating Direction Method of Multipliers algorithm is implemented.
First Claim
1. A system for determining a generator dispatch plan for a power grid under uncertain conditions comprising:a memory storage device;a processor coupled to the memory device, the processor configured to:receive data modeling power flow of active generation units over nodes of a power grid network of multiple local buses interconnected via alternating current transmission lines, said active generation units including conventional energy generators producing energy;receive during a first time interval data of a set of forecast scenario modeling uncertainty in renewable energy output, said set capturing a finite number of scenarios generation for an immediately successive 2nd time interval;formulate a nonconvex optimization problem modeling an economic dispatch problem under renewable-generation uncertainty using said finite number of scenarios;solve said nonconvex optimization problem during said first time interval to obtain power dispatch levels for said generators and energy levels exchanging with a spot market for each scenario at said immediately successive 2nd time interval that minimizes expected cost of power generation and cost of exchanging energy with a spot market modeled for each said modeled uncertainty, wherein to solve said nonconvex optimization problem includes solving a two-stage minimization problem by: decomposing said non-convex optimization problem based on an iterative outer approximation technique, said decomposing including solving a sequence of lower-approximation problems for a first-stage minimization problem with each iteration improving a piecewise-linear outer-approximation for a recourse function that represents the second time interval stage costs of the spot market access.
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
GLOBALFOUNDRIES INC | PO BOX 309 UGLAND HOUSE GRAND CAYMAN KY1-1104 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ghosh, Soumyadip | Peekskill, US | 30 | 265 |
# of filed Patents : 30 Total Citations : 265 | |||
Phan, Dung T | Ossining, US | 21 | 31 |
# of filed Patents : 21 Total Citations : 31 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 2 Citation Count
- G05B Class
- 10.48 % this patent is cited more than
- 10 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 16, 2026 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail