Radiofrequency adjustment for instability management in semiconductor processing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9059101
APP PUB NO 20140256066A1
SERIAL NO

13793735

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and computer programs are presented for reducing chamber instability while processing a semiconductor substrate. One method includes an operation for identifying a first recipe with steps having an operating frequency equal to the nominal frequency of a radiofrequency (RF) power supply. Each step is analyzed with the nominal frequency, and the analysis determines if any step produces instability at the nominal frequency. The operating frequency is adjusted, for one or more of the steps, when the instability in the one or more steps exceeds a threshold. The adjustment acts to find an approximate minimum level of instability. A second recipe is constructed after the adjustment, such that at least one of the steps includes a respective operating frequency different from the nominal frequency. The second recipe is used to etch the one or more layers disposed over the substrate in the semiconductor processing chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LAM RESEARCH CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sato, Arthur San Jose, US 19 479

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00