Secondary battery comprising eutectic mixture and preparation method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9059477
APP PUB NO 20070099090A1
SERIAL NO

11586607

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A secondary battery comprising a cathode, an anode, a separator and an electrolyte that comprises a eutectic mixture formed of: an amide group-containing compound, and an ionizable lithium salt. The anode comprises a metal or metal oxide having a potential vs. lithium potential (Li/Li+) within electrochemical window of the eutectic mixture. Because the secondary battery uses a eutectic mixture as an electrolyte in combination with an anode having a potential vs. lithium potential (Li/Li+) within the electrochemical window of the eutectic mixture, problems such as decomposition of an electrolyte and degradation of the quality of a battery are avoided. Also, due to the thermal and chemical stability, high conductivity and a broad electrochemical window of a eutectic mixture, it is possible to improve the quality as well as safety of a battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Shin Jung Daejeon, KR 20 242
Lee, Byoung Bae Daejeon, KR 12 191
Oh, Jae Seung Seoul, KR 13 191
Park, Jae Duk Daejeon, KR 5 165
Park, Ji Won Daejeon, KR 76 213

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00