Method and system for optimizing prefetching of cache memory lines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9063860
APP PUB NO 20120254540A1
SERIAL NO

13078356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system to optimize prefetching of cache memory lines in a processing unit. The processing unit has logic to determine whether a vector memory operand is cached in two or more adjacent cache memory lines. In one embodiment of the invention, the determination of whether the vector memory operand is cached in two or more adjacent cache memory lines is based on the size and the starting address of the vector memory operand. In one embodiment of the invention, the pre-fetching of the two or more adjacent cache memory lines that cache the vector memory operand is performed using a single instruction that uses one issue slot and one data cache memory execution slot. By doing so, it avoids additional software prefetching instructions or operations to read a single vector memory operand when the vector memory operand is cached in more than one cache memory line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Filippo, Mike Driftwood, US 1 12
Kou, Leigang Austin, US 6 13
Wiedemeier, Jeff Austin, US 10 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00