Formulation and method of use for exploitation and transport of heavy and extra heavy oil wells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9068446
APP PUB NO 20140008062A1
SERIAL NO

13935644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined injection, production and transportation method includes the steps of introducing a mixture of a surfactant, a co-surfactant and a carrier fluid into each of a production well and an injection well so that the mixture flows into porous media surrounding the production well and the injection well, and holding the reservoir mixture in the porous media surrounding the production well in the presence of water for a period of time sufficient to form a water film on surfaces of the porous media surrounding the production well. An injection fluid is then injected into the injection well while producing from the production well, whereby hydrocarbons flow from the porous media around the injection well toward the production well. An injection mixture of a surfactant and a carrier fluid is injected downhole into a desired point in tubing of the production well so that the tubing injection mixture mixes with the production stream forming an emulsion, and the emulsion flows through the tubing to the wellhead. The emulsion can be transported to intermediate locations and then broken and re-formulated for further transport.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEVEP S ACARACAS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Archer, Franklin Caracas, VE 4 6
Manrique, Pablo Caracas, VE 5 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00