Semiconductor device using carbon nanotube, and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9076794
APP PUB NO 20140252615A1
SERIAL NO

13958155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a semiconductor device includes a wiring, a first insulation film, an underlayer deactivation layer, an underlayer, a catalyst layer and a carbon nanotube. The first insulation film is formed on the wiring and includes a hole which exposes the wiring. The underlayer deactivation layer is formed on the first insulation film at a side surface of the hole, and exposes the wiring at a bottom surface of the hole. The underlayer is formed on an exposed surface of the wiring at the bottom surface of the hole and on the underlayer deactivation layer at the side surface of the hole. The catalyst layer is formed on the underlayer at the bottom surface and the side surface of the hole. The carbon nanotube extends from the catalyst layer at the bottom surface of the hole, and fills the hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isobayashi, Atsunobu Yokkaichi, JP 39 477
Saito, Tatsuro Yokkaichi, JP 40 213
Wada, Makoto Yokkaichi, JP 121 1311

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00