Manufacturing device and manufacturing method for hot-rolled steel strip

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9085022
APP PUB NO 20130247638A1
SERIAL NO

13876360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In order to provide a manufacturing device and a manufacturing method for a hot-rolled steel strip, which are capable of obtaining the desired quality of material by rapid uniform cooling immediately after rolling, and improving yield by early sheet tension and sheet shape measurements, a manufacturing device for a hot-rolled steel strip is provided with a finishing rolling mill line (11), a first cooling unit (13) installed just behind the exit side of the finishing rolling mill line, and a pinch roll (14) which is installed on the exit side of the first cooling unit and in contact with both the upper and lower surfaces of a strip (S), at least a wiping roll (15) located on the upper side of the strip (S) is disposed between the first cooling unit and the pinch roll, and a tension/shape measuring unit (16) for measuring the tension and shape of the strip (S); is installed between the wiping roll and the pinch roll.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO 100-8071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eto, Manabu Tokyo, JP 7 35
Horii, Kenji Hiroshima, JP 23 141
Ikemoto, Yuji Hiroshima, JP 7 35
Takeno, Koichi Hiroshima, JP 2 13
Washikita, Yoshiro Tokyo, JP 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00