Process for production of silicon-carbide-coated carbon base material, silicon-carbide-coated carbon base material, sintered (silicon carbide)-carbon complex, ceramic-coated sintered (silicon carbide)-carbon complex, and process for production of sintered (silicon carbide)-carbon complex

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9085493
APP PUB NO 20120156479A1
SERIAL NO

13392593

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Produced is a silicon carbide-coated carbon base material in which a silicon carbide coating is densely and uniformly formed on the surface of a carbon base material, such as graphite. A production process includes the steps of: preparing a carbon base material the surface of which has basal plane sites of an SP2 carbon structure with no dangling bond and edge plane sites of an SP2 carbon structure with a dangling bond; and reacting the surface of the carbon base material with SiO gas in an atmosphere at a temperature of 1400° C. to 1600° C. and a pressure of 1 to 150 Pa to form silicon carbide, whereby the carbon base material coated with silicon carbide is produced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO TANSO CO LTDOSAKA-SHI OSAKA 555-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyamoto, Yoshinari Osaka, JP 21 134
Nakamura, Masaharu Osaka, JP 54 406
Tojo, Tetsuro Osaka, JP 41 198

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00