Optical line terminal of passive optical network, and method for controlling upstream band using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9088382
APP PUB NO 20140270768A1
SERIAL NO

13872612

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are an apparatus and a method capable of adjusting an upstream band for a corresponding ONU by detecting a quantity of bands occupied by a packet, not an effective user packet, among upstream transmission bands for each target object of allocation of each band in the OLT to examine whether a queue report is normal, and detecting an ONU, which transmits an abnormal queue report, according to the examination. An OLT of a PON according to an exemplary embodiment of the present disclosure includes: a frame monitoring unit configured to monitor upstream frame data received for each T-CONT; an error detection unit configured to determine whether a queue report error is generated for each T-CONT according to a result of the monitoring; and a band allocation controller configured to allocate an upstream band for an ONU, in which the queue report error is generated, separately from a normal ONU.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Geun Yong Gwangju, KR 40 199
Kim, Sung Chang Gwangju, KR 46 185
Lee, Dongsoo Seoul, KR 93 531
Lee, Youngsuk Gwangju, KR 13 63
Yoo, Hark Gwangju, KR 43 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00