Bone cement delivery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9095392
APP PUB NO 20130123790A1
SERIAL NO

13463349

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bone cement delivery unit having a rigid support structure with a first portion configured to engage and retain a bone cement reservoir against its casing, a second portion supporting a transmission system and a third portion supporting and guiding a slidable push rod along the injection direction. The delivery system may include a control unit sliding the push rod opposite to the injection direction before stopping the push rod if the quantity of the bone cement pushed out of the reservoir has reached at least a predetermined minimum value, such as to eliminate residual flow. Also, the delivery system may include an adaptor including members electrically connected to the control unit, with the cement reservoir including a sensor for monitoring curing of the bone cement in electrical contact with the members of the adaptor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HABIB MOHAMED61 DISTRICT D SAAD ELDIN WAHBA ST APT 104 AL-AHRAM GARDENS GIZA
BAROUD GAMAL DR620 RUE BELMONT SHERBROOKE J1H 5P3

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baroud, Gamal Canton-de-Hatley, CA 13 741
Habib, Mohamed Sherbrooke, CA 1 0
Imbeault, Denis Sherbrooke, CA 3 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00