Generating power from medium temperature heat sources

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9097143
APP PUB NO 20110048009A1
SERIAL NO

12735688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, and associated apparatus, for generating power from medium temperature heat sources in the range of 200° to 700° C. with improved efficiency compared to systems operating on a Rankine cycle in which the working fluid is condensed at the same temperature. Water is heated in a boiler (11) with heat from the heat source A, (22) which may be a stream of exhaust gases (22), in order to generate wet steam having a dryness fraction in the range of 0.10 to 0.90 (10% to 90% dry). The wet steam is expanded to generate power in a positive displacement steam expander (21) such as a twin screw expander. The expanded steam is condensed at a temperature in the range of 70° C. to 120° C., and the condensed steam is returned to the boiler. The expanded steam may be condensed in the boiler of an Organic Rankine Cycle (22) to provide additional power, or by heat exchange with a heater of a heating system to provide a Combined Heat and cycle, thereby further improving the cycle efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CITY UNIVERSITYLONDON EC1V 0HB

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Smith, Ian Kenneth London, GB 6 63
Stosic, Nikola Rudi London, GB 8 73

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00