Pump rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9097250
APP PUB NO 20130112028A1
SERIAL NO

13670358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pump rotor is an inner rotor of an internal gear pump, the inner rotor having a tooth profile, wherein a half-tooth portion of the tooth profile is formed of three tooth-profile formation circles that are elliptical or true-circular. Two of the tooth-profile formation circles are a combination of a small tooth-profile formation circle and a large tooth-profile formation circle in which the small tooth-profile formation circle is inscribed and is entirely included. A portion of the small tooth-profile formation circle forms an addendum portion of the half-tooth portion. A portion of the large tooth-profile formation circle in which the small tooth-profile formation circle is inscribed and is entirely included forms an engagement portion of the half-tooth portion. A portion of another tooth-profile formation circle that circumscribes the large tooth-profile formation circle forms a dedendum portion of the half-tooth portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAMADA MANUFACTURING CO LTDKIRYU-SHI GUNMA-KEN 376-8585

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujiki, Kenichi Isesaki, JP 28 378
Izutsu, Masato Isesaki, JP 16 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00