Combustion device for melting furnace and melting furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9109836
APP PUB NO 20130137055A1
SERIAL NO

13503259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion device for a melting furnace, capable of heating a melting target object and the ceiling portion of the furnace with the radiant heat of the flame, including a combustion space above the location of the melting target object, including a fuel injection nozzle having a plurality of fuel injecting portions, which portions include orifices disposed side by side horizontally relative to the direction of fuel injection, and formed side by side vertically relative to the same. The orifices are formed radially side by side as seen laterally, with a direction along a middle angle in the angular range between the fuel injection direction of the uppermost fuel injection orifice and the fuel injection direction of the lowermost fuel injection orifice being directed obliquely upwards. The fuel injection orifices of the upper fuel injecting portion are formed radially side by side as seen in the plane view.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSAKA GAS CO LTD1-2 HIRANOMACHI 4-CHOME CHUO-KU OSAKA OSAKA-SHI 5410046

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirano, Makoto Osaka, JP 103 949
Inoue, Hitoshi Hannan, JP 129 1831

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00