System and method for generating a point-in-time copy of a subset of a collectively-managed set of data items

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9111015
SERIAL NO

12893108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various systems and methods selectively generate a point-in-time copy of less than all of the data items within a collectively-managed set of data items. One method involves detecting a modification to a first unit of data within a collectively managed set, subsequent to generation of a selective snapshot of the collectively managed set, and then accesses a first tag associated with the first unit of data. Based on a value of the first tag, the method determines whether the first unit of data is included in a subset of the collectively managed set. The subset includes at least two of the units of data and fewer than all of the units of data in the collectively managed set. Based upon whether the unit of data is included in the subset, the method selects whether to preserve an original value of the first unit of data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VERITAS TECHNOLOGIES LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patwardhan, Kedar Shrikrishna Maharashtra, IN 20 172
Pusalkar, Maneesh Maharashtra, IN 9 292
Ranade, Dilip Madhusudan Maharashtra, IN 18 890

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00