Front sheet of solar cell, method of manufacturing the same and photovoltaic module comprising the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9117952
APP PUB NO 20120204952A1
SERIAL NO

13371069

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A front sheet of solar cell, a method of manufacturing the same and a photovoltaic module are provided. The front sheet of solar cell can effectively block infrared rays (IRs) by forming an IR blocking layer including a cholesteric liquid crystal (CLC) material on a substrate. Thus, an increase in temperature of a cell can be suppressed so that the power generation efficiency of the cell can be improved. Also, the multi-layered sheet can be configured so that a UV blocking layer including a fluorine-based polymer and a wavelength conversion material can be formed on the IR blocking layer. Thus, wavelengths of a UV region can be converted into wavelengths of a VR region so that the power generation efficiency of the cell can be improved, and discoloration and deformation caused by UVs can be prevented so that the weather resistance can be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Hyun Cheol Daejeon, KR 107 175
Ko, Hyun Seong Seoul, KR 12 56
Kwon, Yoon Kyung Daejeon, KR 22 81
Lee, Dae Hee Daejeon, KR 142 405
Park, Moon Soo Daejeon, KR 179 769

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00