Fluid conduit with variable flow resistance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9127799
APP PUB NO 20130255815A1
SERIAL NO

13851232

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid-carrying conduit achieves variable resistance to flow. An elongate, hollow body casing has at least one chamber containing either a dilatant fluid or an electroactive polymer. In the case of the dilatant fluid, a reduction in an effective flow cross section of the fluid line occurs in reaction to an increase in the shear rate of a fluid flowing through the fluid line. In the case of the electroactive polymer, a reduction in an effective flow cross section of the fluid line occurs in reaction to an electric current being applied to the body casing. The conduit may be configured for use as a degassing line in a cooling system of an internal combustion engine. The conduit may have a reinforcement encircling the electroactive polymer. The conduit may have an electrically conductive connecting surface adjacent to the electroactive polymer. The electroactive polymer may be an ionic electroactive polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC330 TOWN CENTER DRIVE SUITE 800 DEARBORN MI 48126

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brinkmann, Bernd Dormagen, DE 25 166
Kaufeld, Harald Pulheim, DE 2 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00