Adjusting controls at the physical layer to control link quality at higher layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9137085
APP PUB NO 20130114625A1
SERIAL NO

13808180

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for controlling a performance of a communication link in a data communication system comprises mapping performance of a communication link, as characterized by metrics computed at a first protocol layer in a network device, to quality of the communication link as characterized by metrics computed at a second protocol layer in the network device. The second protocol layer is higher than the first protocol layer in a protocol stack running on the network device. A setting of one or more communication link controls at the first protocol layer is adjusted to attain a given communication link performance at the first protocol layer that, according to the mapping between the communication link performance at the first protocol layer and the quality of the communication link at the second protocol layer, corresponds to a target quality of the communication link at a second protocol layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cunningham, Christopher Craig Belmont, US 1 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00