Aluminum alloy brazing sheet and method for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9138833
APP PUB NO 20100101688A1
SERIAL NO

12528807

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is an aluminum alloy brazing sheet for heat exchanger which excels in resistance to corrosion from its inside and simultaneously attains satisfactory erosion resistance and high strength. This includes a core material of an Al alloy containing predetermined amounts of Si, Mn, Cu, Mg, and Ti; a clad material of an Al alloy containing predetermined amounts of Si, Mn, and Zn, having a predetermined thickness, and lying on one side of the core material so as to constitute an inner side of a tube member of the heat exchanger; and a filler material of an Al alloy containing a predetermined amount of Si, having a predetermined thickness, and lying on the other side of the core material so as to constitute an outer side of the tube member. The crystal grain size of the core material after brazing under specific conditions is 50 μm or more but less than 300 μm in a rolling direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kimura, Shimpei Moka, JP 29 173
Koshigoe, Fumihiro Moka, JP 13 153
Ueda, Toshiki Moka, JP 32 272

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00