Semiconductor device and method of forming wafer level die integration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9142514
APP PUB NO 20120276691A1
SERIAL NO

13546726

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a wafer level chip scale package (WLCSP), a semiconductor die has active circuits and contact pads formed on its active surface. A second semiconductor die is disposed over the first semiconductor die. A first redistribution layer (RDL) electrically connects the first and second semiconductor die. A third semiconductor die is disposed over the second semiconductor die. The second and third semiconductor die are attached with an adhesive. A second RDL electrically connects the first, second, and third semiconductor die. The second RDL can be a bond wire. Passivation layers isolate the RDLs and second and third semiconductor die. A plurality of solder bumps is formed on a surface of the WLCSP. The solder bumps are formed on under bump metallization which electrically connects to the RDLs. The solder bumps electrically connect to the first, second, or third semiconductor die through the first and second RDLs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • STATS CHIPPAC PTE. LTE.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Camacho, Zigmund R Singapore, SG 60 1685
Dahilig, Frederick R Singapore, SG 10 115
Merilo, Dioscoro A Singapore, SG 61 1542
Tay, Lionel Chien Hui Singapore, SG 116 1741

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00