Semiconductor power converter and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9147673
APP PUB NO 20140117526A1
SERIAL NO

14025019

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a semiconductor power converter includes first and second electrical conductors opposed to each other, first and second semiconductor elements joined to a first joint surface of the first electrical conductor, first and second convex electrical conductors joined to the first and second semiconductor elements, a junction joined to the first and second convex electrical conductors and a second joint surface of the second electrical conductor, power terminals, signal terminals, and an envelope sealing the constituent members. The envelope includes a flat bottom surface which extends perpendicular to the semiconductor elements and in which first and second bottom surfaces of the electrical conductors are exposed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maruno, Koji Yokkaichi, JP 4 14
Masunaga, Takayuki Yokkaichi, JP 20 338
Nishiuchi, Hideo Kuwana, JP 25 191
Shimizu, Yoshiyuki Tokyo, JP 139 1592
Togasaki, Takashi Yokohama, JP 19 137
Ueda, Kazuhiro Aisai, JP 91 1303
Watanabe, Naotake Mie-gun, JP 19 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00