Insulated gate bipolar transistor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9153676
APP PUB NO 20140124830A1
SERIAL NO

14154736

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An IGBT has layers between emitter and collector sides, including a drift layer, a base layer electrically contacting an emitter electrode and completely separated from the drift layer, first and second source regions arranged on the base layer towards the emitter side and electrically contacting the emitter electrode, and first and second trench gate electrodes. The first trench gate electrodes are separated from the base layer, the first source region and the drift layer by a first insulating layer. A channel is formable between the emitter electrode, the first source region, the base layer and the drift layer. A second insulating layer is arranged on top of the first trench gate electrodes. An enhancement layer separates the base layer from the drift layer. The second trench gate electrode is separated from the base layer, the enhancement layer and the drift layer by a third insulating layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ABB SCHWEIZ AG;ABB TECHNOLOGY AG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andenna, Maxi Dättwil, CH 10 49
Corvasce, Chiara Bergdietikon, CH 22 67
Kopta, Arnost Zürich, CH 22 134
Rahimo, Munaf Uezwil, CH 76 225

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00