High power two cycle engine (without oil and gasoline/benzene mixing)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9157349
APP PUB NO 20150252722A1
SERIAL NO

14336850

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine of the two-cycle type comprises a cylinder and a combustion chamber defined by a piston slidable within the cylinder and a cylinder head. A fuel injection mechanism for injecting fuel into the combustion chamber is provided. A crankshaft provides reciprocating motion to the piston. Lubricating mechanism provides lubrication to the crankshaft. A mechanism around the bottom of the piston prevents crankshaft lubrication from reaching the combustion chamber. A valve prevents escape of oil from air and smoke openings. Oil is not mixed with the fuel in the combustion chamber. Heating mechanism is provided for heating the fuel prior to the fuel being injected into the combustion chamber. A command control for controlling timely opening and closing of the smoke and air valves, the spark plugs and the injector is provided. Contrary to cycle engines which have no valve it has two electric valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FARZANEH ALIW HILLSDALE BLVD SAN MATEO CA 94403

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Darabi, Abdolreza Tehran, IR 1 0
Farzaneh, Ali Farzad Tehran, IR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00