Fluid injection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9163489
APP PUB NO 20120003043A1
SERIAL NO

13256314

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is described of injecting CO2 into an aquifer or a depleted hydrocarbon reservoir (211) via at least one injection well (202) that penetrates said aquifer or reservoir, wherein the injection well is provided with an injection tubing (203) that is in sealing engagement with the injection well. The injection tubing terminates at or immediately above the interval of the aquifer or the reservoir into which the CO2 is to be injected and the injection tubing is provided with a fluid injection control valve (208) at or near the bottom thereof which is closed or closes when the pressure above the valve is less than a pre-set pressure value and opens or reopens when the pressure above the valve is at or greater than said pre-set pressure value, the pre-set pressure value being selected such that the CO2 in the injection tubing is maintained in a liquid or supercritical state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BP ALTERNATIVE ENERGY INTERNATIONAL LIMITEDSUNBURY ON THAMES TW16 7BP

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cawley, Stephen John Aberdeen, GB 1 8
Galic, Hrvoje Aberdeen, GB 1 8
Mason, John Nigel Ellis Aberdeen, GB 1 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00