Method and system for improving startup performance and interoperability of a virtual application

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9170829
APP PUB NO 20110191772A1
SERIAL NO

12697029

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A data structure including simple and complex objects. Each simple object includes a content type indicator, a size indicator, and one or more simple data types. Each complex object includes a content type indicator, a size indicator, and one or more child objects. The complex objects include a layer object having first and second child objects. The first child object is a collection of complex objects storing information for configuring a virtual filesystem of a virtual application at application startup. The second child object is a collection of complex objects storing information for configuring a virtual registry of the virtual application at application startup. Reading of selected simple and complex objects may be deferred at startup based on the content type indicator. Deferred objects may be read after startup when access to information stored by the deferred object is request by the virtual application.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CODE SYSTEMS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Larimore, Stefan I Redmond, US 21 974
Murphey, C Michael Seattle, US 15 771
Obata, Kenji C Seattle, US 39 1640

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00