Waste heat recovery system for controlling EGR outlet temperature

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9175643
APP PUB NO 20140202149A1
SERIAL NO

14239487

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine system and various methods for controlling the outlet temperature of an EGR stream before entering an engine intake system are disclosed. In a system and the various methods, an exhaust gas recirculation (EGR) valve is positioned within an EGR passage fluidly connecting an engine exhaust stream and an engine intake stream, while a waste heat recovery (WHR) system is used to recover heat from the EGR stream. An engine control unit (ECU) is coupled to various sensors and valves to divert working fluid in the WHR system from cooling the EGR exhaust flow below a level which favors production of condensation in the engine intake system. The ECU operates to divert working fluid flow away from the EGR boiler when sensors indicate characteristics of either the exhaust flow or the intake stream which might lead to heavy condensation. A three-way valve is also used to divert the working fluid to a variable expansion valve fluidly coupled to the three-way valve in response to a signal from one of the sensors to prevent damage to the system turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL ENGINE INTELLECTUAL PROPERTY COMPANY, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Deokkyu Naperville, US 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00