Energy-saving central heating and hot water supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9175864
APP PUB NO 20120227953A1
SERIAL NO

13310905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy-saving heating and hot water supply system includes a main heat exchanger, a circulation pump, a hot water supply heat exchanger and a hot water distributor. The main heat exchanger produces heating water through a heat exchange. The circulation pump circulates the heating water produced in the main heat exchanger so that the heating water is supplied to and collected from each household or floor. The hot water supply heat exchanger produces hot water through a heat exchange between water for hot water supply and the heating water supplied from the main heat exchanger and circulates the produced hot water in a floor coil through the hot water distributor or directly circulates the produced hot water in the floor coil. The hot water distributor receives the heating water and circulates the received heating water in the floor coil provided for each household or floor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GU-SUNG ENGINEERING & CONSTRUCTION CO LTD503 SUYU PLAZA 63 SUYU-DONG GANGBUK-GU SEOUL 142-874

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yun, Sok Ku Seoul, KR 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00