Water injection controller, water injection control method, and water injection control program for rolling lines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9180505
APP PUB NO 20120298224A1
SERIAL NO

13575656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water injection controller and method usable in rolling lines using stored cooling water to cool a material. A cooling water usage predictor predicts, for a respective prescribed prediction cycle, usage of cooling water in a prescribed prediction target period. A constrained running condition predictor takes the predicted cooling water usage to predict a required running condition of a pump system in the prediction target period meeting a prescribed constraint condition. An energy consumption calculator takes the predicted running condition of the pump system to calculate an energy quantity to be consumed. An optimizer determines an optimal energy quantity to be consumed among plural energy quantities to be consumed under changed running conditions of the pump system. A pump system running controller controls running of the pump system having as a target value therefor a running condition of the pump system requiring the optimal quantity of energy to be consumed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imanari, Hiroyuki Minato-ku, JP 26 119
Kihara, Mirei Minato-ku, JP 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00