Hydraulic driving apparatus for working machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9181070
APP PUB NO 20120285159A1
SERIAL NO

13467340

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an apparatus provided in a working machine to lower a load, comprising a hydraulic pump, a hydraulic actuator, a manipulation device having a manipulation member, a meter-in flow control device, a meter-out flow control device, a back pressure valve, a regeneration fluid passage branched from the meter-out fluid passage at a position upstream of the back pressure valve and merged with the meter-in fluid passage, and a check valve. The meter-in flow control device controls a meter-in flow rate in a region of the meter-in fluid passage upstream of a merging point with the regeneration fluid passage. The meter-out flow control device controls a meter-out flow rate in a region of the meter-out fluid passage upstream of a branching point of the regeneration fluid passage so as to make the meter-out flow rate be greater than the meter-in flow rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOBELCO CRANES CO., LTD.;KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hori, Naoto Akashi, JP 12 64
Kitazumi, Naoya Akashi, JP 3 22
Kondo, Hiroo Akashi, JP 6 29
Maekawa, Satoshi Kobe, JP 46 347
Michida, Takaharu Akashi, JP 6 33
Sugano, Naoki Kobe, JP 34 261
Yamagata, Katsuki Akashi, JP 7 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00